The Campaign for The Brinton Museum

Capital Campaign Goal of $21,000,000

Close to $17,000,000 raised in donations and pledges as of October 1, 2014 For a printable donation card please click here

Challenge Grant: Up to two million dollars will be matched by a generous donor to reach the campaign goal and raise the remaining four million dollars.

Tentative Opening Date of the Forrest E. Mars, Jr. Building at The Brinton Museum: mid-June 2015

The Forrest E. Mars, Jr. Building at The Brinton Museum  Design by Malone Belton Abel

The FORREST E. MARS, JR. BUILDING at THE BRINTON MUSEUM
                                                                   MALONE BELTON ABEL P.C.                                                                                                      Architecture/Engineering/Interior Design/Planning                                                    September 2014

For Facts about the Building  please click here:

New Building September 2014

New Building September 2014

The defining feature: the structural rammed earth wall:

Complete Rammed Earth Wall

Complete Rammed Earth Wall                                      MALONE BELTON ABEL P.C.            Architecture/Engineering/Interior Design/Planning

 

Gallatin Direction

Gallatin Direction    Architect: MALONE BELTON ABEL P.C.

Medicine Wheel Direction

Medicine Wheel Direction                                            Architect: MALONE BELTON ABEL P.C.

New Building, March 26, detail

The Wall, March 26, detail

 

New pictures of the construction progress posted weekly on our FaceBook page.

 

Annual Giving: Supporting the operations and programs of the Museum
Annual Giving Information PDF (printable version)

Comments are closed.